Site and system
CustomerNorbert Langosh
Site94187 Keanu Shore Suite 652, Port Durwardland, QLD, 3264
SuburbPort Durwardland Queensland 3264
NMI87330774303566925038
Meter—
Network—
PhaseSingle phase
Rooftiled
System typeGrid-connected solar (PV only)
System size6.6 kW
Modules—
Inverter—
Installed—
Switchboard—
SupplySingle phase
Roof condition—
Tilt / azimuth—° / —
Monitoring—
Checklist
Array, mounting and DC side · AS/NZS 5033:2021
| Modules, quantity and layout match the approved design |
— |
|
| No cracked glass, delamination, hot spots or damaged frames |
— |
|
| Rails, clamps and fixings secure; roof penetrations sealed |
— |
|
| Clearances and ventilation match the manufacturer instructions |
— |
|
| DC cables supported, UV-rated and clear of sharp edges and water paths |
— |
|
| Connectors matched, fully engaged and of the same type |
— |
|
| Strings and MPPT allocation match the as-built diagram |
— |
|
| DC isolator accessible, labelled and operating correctly |
— |
|
| Array frames and rails bonded to earth |
— |
|
| No new shading, growth or obstruction since installation |
— |
|
Inverter and grid connection · AS/NZS 4777.2:2020
| Model is on the current approved inverter list |
— |
|
| Firmware is a version approved for this model |
— |
|
| Grid protection profile matches the state and DNSP |
— |
|
| Export limit set as approved by the DNSP |
— |
|
| AC breaker, cabling and isolation match the design |
— |
|
| Mounting, clearances and ventilation per the instructions |
— |
|
| Anti-islanding and grid protection confirmed |
— |
|
| Monitoring connected, reporting and in the customer's name |
— |
|
| No active faults; the fault history has been reviewed |
— |
|
| Shutdown and restart demonstrated safely |
— |
|
Earthing and electrical tests · AS/NZS 3000
| Main earthing conductor and terminal secure |
— |
|
| Exposed conductive parts bonded as designed |
— |
|
| RCD or RCBO operates within the required trip time |
— |
|
| Polarity correct at every test point |
— |
|
| Insulation resistance meets the recorded results |
— |
|
| Switchboard circuits identified and labelled |
— |
|
Labelling and handover · AS/NZS 5033 and AS/NZS 3000
| PV array and DC isolation labels in place |
— |
|
| Inverter and battery labels in place |
— |
|
| Multiple or alternative supply warning at the main switchboard |
— |
|
| Shutdown procedure on site, legible and correct |
— |
|
| Monitoring app handed over and signed in |
— |
|
| Maintenance and cleaning guidance given |
— |
|
| Emergency contact and warranty process explained |
— |
|
Documents and warranty file · SAA guidance and manufacturer warranty conditions
| As-built single-line diagram and array layout supplied |
— |
|
| Electrical certificate recorded (COES, CCEW, CoC or NOC) |
— |
|
| DNSP approval and export limit on file |
— |
|
| Equipment manuals supplied |
— |
|
| Product warranties registered or recorded |
— |
|
| Proof of purchase on file |
— |
|
| Serial number and installation photos attached |
— |
|
| Customer concerns recorded and answered |
— |
|
Test results
| Highest string open-circuit voltage |
— V DC |
| Insulation resistance |
— MΩ |
| Protective earth continuity |
— Ω |
| AC supply voltage |
— V AC |
| Grid frequency |
— Hz |
| RCD trip time |
— ms |
| RCD rated residual current |
— mA |
| Irradiance at the time of test |
— W/m² |
| Test instrument |
—
|
Declaration
I certify that I carried out this inspection, that the results recorded are the readings I measured on site,
and that the work complies with the standards named above except where a defect is listed.
NameDana Whitfield
Company—
LicenceREC 22145
Date2026-10-29
Signature images are in the signatures folder of this pack.
Attachments