WIR-44126 · job JOB-759170 · inspected 29 October 2026

Pass — ready for handover

Site and system

CustomerNorbert Langosh
Site94187 Keanu Shore Suite 652, Port Durwardland, QLD, 3264
SuburbPort Durwardland Queensland 3264
NMI87330774303566925038
Meter—
Network—
PhaseSingle phase
Rooftiled
System typeGrid-connected solar (PV only)
System size6.6 kW
Modules—
Inverter—
Installed—
Switchboard—
SupplySingle phase
Roof condition—
Tilt / azimuth—° / —
Monitoring—

Checklist

Array, mounting and DC side · AS/NZS 5033:2021

Modules, quantity and layout match the approved design —
No cracked glass, delamination, hot spots or damaged frames —
Rails, clamps and fixings secure; roof penetrations sealed —
Clearances and ventilation match the manufacturer instructions —
DC cables supported, UV-rated and clear of sharp edges and water paths —
Connectors matched, fully engaged and of the same type —
Strings and MPPT allocation match the as-built diagram —
DC isolator accessible, labelled and operating correctly —
Array frames and rails bonded to earth —
No new shading, growth or obstruction since installation —

Inverter and grid connection · AS/NZS 4777.2:2020

Model is on the current approved inverter list —
Firmware is a version approved for this model —
Grid protection profile matches the state and DNSP —
Export limit set as approved by the DNSP —
AC breaker, cabling and isolation match the design —
Mounting, clearances and ventilation per the instructions —
Anti-islanding and grid protection confirmed —
Monitoring connected, reporting and in the customer's name —
No active faults; the fault history has been reviewed —
Shutdown and restart demonstrated safely —

Earthing and electrical tests · AS/NZS 3000

Main earthing conductor and terminal secure —
Exposed conductive parts bonded as designed —
RCD or RCBO operates within the required trip time —
Polarity correct at every test point —
Insulation resistance meets the recorded results —
Switchboard circuits identified and labelled —

Labelling and handover · AS/NZS 5033 and AS/NZS 3000

PV array and DC isolation labels in place —
Inverter and battery labels in place —
Multiple or alternative supply warning at the main switchboard —
Shutdown procedure on site, legible and correct —
Monitoring app handed over and signed in —
Maintenance and cleaning guidance given —
Emergency contact and warranty process explained —

Documents and warranty file · SAA guidance and manufacturer warranty conditions

As-built single-line diagram and array layout supplied —
Electrical certificate recorded (COES, CCEW, CoC or NOC) —
DNSP approval and export limit on file —
Equipment manuals supplied —
Product warranties registered or recorded —
Proof of purchase on file —
Serial number and installation photos attached —
Customer concerns recorded and answered —

Test results

Highest string open-circuit voltage — V DC
Insulation resistance — MΩ
Protective earth continuity — Ω
AC supply voltage — V AC
Grid frequency — Hz
RCD trip time — ms
RCD rated residual current — mA
Irradiance at the time of test — W/m²
Test instrument —

Declaration

I certify that I carried out this inspection, that the results recorded are the readings I measured on site, and that the work complies with the standards named above except where a defect is listed.

NameDana Whitfield
Company—
LicenceREC 22145
Date2026-10-29

Signature images are in the signatures folder of this pack.

Attachments

No files attached.